True/False
Question
The problems of congestion, bottlenecks and backtracking can not be visualized by using templates and models.
Correct Answer
False
Your Answer
False

Multiple Choice Multiple Answer
Question
Following are some of the factors which influence process planning
Correct Answer
Order Quantity , Process capability of machine , Delivery Dates
Your Answer
Process capability of machine , Delivery Dates , Order Quantity

Multiple Choice Single Answer
Question
Gross requirement of products is determined on the basis of
Correct Answer
Both forecast and pending orders
Your Answer
Both forecast and pending orders

True/False
Question
Skill of labour force in a product type layout is usually higher than in the process type of layout
Correct Answer
False
Your Answer
True

Multiple Choice Single Answer
Question
In exponential smoothing method,for a stable demand pattern and better smoothing effect, value of fraction( Alpha) selected is
Correct Answer
0.05 to 0.10
Your Answer
0.05 to 0.10

True/False
Question
Recording of movement is not necessary in case of method study in any form.
Correct Answer
False
Your Answer
True

Multiple Choice Multiple Answer
Question
Which of the following may be the objectives of project crashing?
Correct Answer
To complete the project in the least possible time , To reduce project cost below it's normal cost , To achieve uniformity in requirement of resources
Your Answer
To complete the project in the least possible time , To reduce project cost below it's normal cost , To achieve uniformity in requirement of resources

Multiple Choice Single Answer
Question
Which is the next stage to the inspection based quality control in the historical development of quality management.
Correct Answer
Quality assurance
Your Answer
Total Quality management

Select The Blank
Question
The ________ includes preventive maintenance activities whose needs are identified through inspection which requires stoppage of machines.
Correct Answer
Shutdown Maintenance
Your Answer
Shutdown Maintenance

Multiple Choice Single Answer
Question
Inadequate production capacity ultimately leads to
Correct Answer
Poor Customer Service
Your Answer
Low Productivity

Select The Blank
Question
The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking.
Correct Answer
Condition monitoring
Your Answer
Condition monitoring

True/False
Question
Inspection should be conducted on all incoming materials, semifinished items, bought out components, subcontract items prior to any operation, assembly.
Correct Answer
True
Your Answer
True

Select The Blank
Question
The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average.
Correct Answer
Acceptable quality level
Your Answer
Acceptable quality level

Multiple Choice Single Answer
Question
Production Planning includes
Correct Answer
Predetermination of manufacturing requirements
Your Answer
Predetermination of manufacturing requirements

Multiple Choice Multiple Answer
Question
Expediting function is concerned with following activities
Correct Answer
Progress chasing to identify delays which may hold up production , Communicating possible delays in delivery date commitment to sales department , Devising cures to keep rate of production in line with schedule
Your Answer
Progress chasing to identify delays which may hold up production , Communicating possible delays in delivery date commitment to sales department , Devising cures to keep rate of production in line with schedule

Select The Blank
Question
The ________ is the watch dog which ensures that every element of production and activities which could affect the quality of end product are regulated to the extent desirable.
Correct Answer
Quality control
Your Answer
Quality control

True/False
Question
A load chart specifies the work to be carried out by each person of company during shift hours.
Correct Answer
False
Your Answer
False

Match The Following
Question
Correct Answer
Your Answer
Pessimistic time
b
b
Expected time
Te
Te
Optimistic time
a
a
Most likely time
m
m

True/False
Question
Breakdown is inversly proportional to the investment in W.I.P.
Correct Answer
False
Your Answer
True

Select The Blank
Question
Production Planning is a centralised activity which includes functions such as ________
Correct Answer
Scheduling
Your Answer
Scheduling

Select The Blank
Question
A set of activities to keep an equipment in the specified condition is called as ________.
Correct Answer
Maintenance
Your Answer
Maintenance

Multiple Choice Single Answer
Question
A good plant layout helps in
Correct Answer
Reducing handling costs
Your Answer
Reducing handling costs

Select The Blank
Question
The ________ is the probability that a good lot will be rejected by the sampling plan.
Correct Answer
Producer's risk
Your Answer
Producer's risk

Multiple Choice Multiple Answer
Question
Components of Production Management include
Correct Answer
Capacity Planning , Job Design , Production Planning
Your Answer
Capacity Planning , Job Design , Production Planning

Multiple Choice Single Answer
Question
Technique of Value Engineering can be effectively employed in design of a product to
Correct Answer
To meet the intended function at lowest cost
Your Answer
To meet the intended function at lowest cost

Multiple Choice Multiple Answer
Question
Which are the subtasks of the maintenance phase of the method study?
Correct Answer
Monitoring and control , Performance appraisal , Audit on savings
Your Answer
Monitoring and control , Performance appraisal , Audit on savings

True/False
Question
short cycle job should be studied for macroscopic motions.
Correct Answer
False
Your Answer
True

Select The Blank
Question
The ________ is a set of tools and techniques by which products are made to comply with the specifications at minimum cost to the firm.
Correct Answer
Quality control system
Your Answer
Quality control system

True/False
Question
Inspection Order can be a verbal order
Correct Answer
True
Your Answer
False

Multiple Choice Single Answer
Question
Need for change in layout can occur due to following reason
Correct Answer
introduction of new product
Your Answer
improve quality

Select The Blank
Question
Goods after final inspection should accompany ________to enable dispatch department to identify and draw correct reference.
Correct Answer
Forwarding note
Your Answer
Forwarding note

Multiple Choice Multiple Answer
Question
Which are the different methods of recording actual progress of work?
Correct Answer
Display boards , Progress cards , Network updating
Your Answer
Display boards , Progress cards , Network updating

Select The Blank
Question
The term ________ emplies the foregone profit due to inability of company to produce.
Correct Answer
Opportunity cost
Your Answer
Opportunity cost

Multiple Choice Single Answer
Question
What do you mean by lowest possible direct cost required to complete an activity within it's crashed time?
Correct Answer
Crash cost
Your Answer
Normal cost

Multiple Choice Single Answer
Question
Any premise in which persons are employed for purpose of making any product/s is called
Correct Answer
Factory
Your Answer
Factory

Multiple Choice Single Answer
Question
The process of changing inputs into outputs thereby adding some value to entity can be defined as
Correct Answer
Operation
Your Answer
Operation

Multiple Choice Single Answer
Question
What do you mean by the selection of the job for the method study on the basis of manufacturing difficulties?
Correct Answer
Technical consideration
Your Answer
Economic consideration

True/False
Question
In case of backward pass computation, the latest event time of the end event equals to the earliest event time minus duration of that activity.
Correct Answer
False
Your Answer
True

Match The Following
Question
Correct Answer
Your Answer
Emerson Efficiency Plan
Wage Payment
Wage Payment
Craft
Facilities Planning
Facilities Planning
Work Sampling
Machine utilization
Machine utilization
Gantt Chart
Production Scheduling
Production Scheduling

Multiple Choice Multiple Answer
Question
Which of the following are examples of addition during recording for method study?
Correct Answer
Brazing , Welding , Riveting
Your Answer
Brazing , Welding , Riveting

Multiple Choice Single Answer
Question
The ratio of output to input of a production system is commonly known as
Correct Answer
Productivity
Your Answer
Productivity

Multiple Choice Single Answer
Question
In case of Batch Production which kind of labour is expected?
Correct Answer
Skilled in one specific Manufacturing Process
Your Answer
Skilled in all Manufacturing Processes

Select The Blank
Question
The ________ is necessary when the job requires detailed of one or more of the job characteristics with the help of special equipment which is not available at the producing company.
Correct Answer
Inspection order
Your Answer
Inspection order

Multiple Choice Multiple Answer
Question
Which are the factors on which the structure of the transportation cost depends?
Correct Answer
Average distance of shipment , Characteristics of the commodity , Medium of shipment
Your Answer
Average distance of shipment , Characteristics of the commodity , Medium of shipment

Multiple Choice Single Answer
Question
Which is the ideal place to inspect jigs and fixtures in a mass manufacturing unit?
Correct Answer
Separate inspection room
Your Answer
Separate inspection room

True/False
Question
In Gantt Chart, the horizontal lines devide vertical lines into sections which represents either operations or work centres.
Correct Answer
True
Your Answer
True

No comments:

Search Assignments and Papers Here...


Custom Search

An Appeal to SCDL students

Dear SCDL Student,

We at http://scdlpapers.blogspot.com tries to collect and spread the knowledge in terms of the solved papers and assignments which we are getting through SCDL Alumni.
Now we request you to help other students through mutual sharing. Please send your assignment questions/papers to "mindgrill@gmail.com" . We will publish them on this blog along with your name.
Your help can be boon for many students to clear their exams.

Best of Luck and waiting for your contributions.

Team @ MindGrill