Multiple Choice Single Answer
Question What do you mean by the project duration for which the total
cost is minimum?
Correct Answer Optimum duration
Your Answer Optimum duration
Multiple Choice Multiple Answer
Question Lack of material planning results in the following
Correct Answer Over ordering , under ordering , stockouts
Your Answer under ordering , stockouts , Over ordering
Multiple Choice Single Answer
Question Which kind of defect can be called as minor defect?
Correct Answer Which does not reduce the usability of the product
for its intended use
Your Answer Which does not reduce the usability of the product for its
intended use
Multiple Choice Single Answer
Question What does CPA stand for?
Correct Answer Critical Path Analysis
Your Answer Critical Project Analysis
True/False
Question Grouping of machines gives a lot of flexibility in loading
and scheduling
Correct Answer True
Your Answer True
True/False
Question Fixed cost is lower in case of continuous production than
intermittent production.
Correct Answer False
Your Answer False
Select The Blank
Question Function concerned with fixation of time allowed to
qualified worker for a job is called ________.
Correct Answer Work Measurement
Your Answer Time Measurement
Select The Blank
Question The design of any layout is governed by large number of
factors and the best layout is expected to ________ all these factors.
Correct Answer Optimise
Your Answer Consider
Multiple Choice Multiple Answer
Question Which of the following is not the characteristic of Project
Production?
Correct Answer Continuous flow of material , Highly mechanised
material handling , Virtually zero manufacturing cycle time
Your Answer Continuous flow of material , Highly mechanised material
handling , Virtually zero manufacturing cycle time
Multiple Choice Single Answer
Question The process of changing inputs into outputs thereby adding
some value to entity can be defined as
Correct Answer Operation
Your Answer Operation
Multiple Choice Multiple Answer
Question Which of the following cases can be treated as delay during
recording of method study?
Correct Answer Operators awaiting instructions from supervisor ,
Worker waiting for his turn at tools stores , Jobs awaiting at the machines
for their turn
Your Answer Operators awaiting instructions from supervisor , Worker
waiting for his turn at tools stores , Jobs awaiting at the machines for
their turn
True/False
Question Root cause of most of the breakdowns is failure of the
lubrication system.
Correct Answer True
Your Answer True
Multiple Choice Multiple Answer
Question Which of the following are steps to identify the critical
path in a small network?
Correct Answer Compare the durations of all paths to identify the
longest path. , Sum up the durations of activities along each path. ,
Enumerate all paths in the network and list down activities on each path.
Your Answer Compare the durations of all paths to identify the longest
path. , Sum up the durations of activities along each path. , Enumerate all
paths in the network and list down activities on each path.
Match The Following
Question Correct Answer Your Answer
Emerson Efficiency Plan Wage Payment Wage Payment
Craft Facilities Planning Facilities Planning
Work Sampling Machine utilization Machine utilization
Gantt Chart Production Scheduling Production Scheduling
Multiple Choice Multiple Answer
Question What are the benefits of overhauling?
Correct Answer It increases useful life of an equipment and it's
parts , Advance planning allows to attend equipment without disturbing the
production programme , Advance planning allows to prepare and keep ready the
list of replacement spares
Your Answer It increases useful life of an equipment and it's parts ,
Advance planning allows to attend equipment without disturbing the
production programme , Advance planning allows to prepare and keep ready the
list of replacement spares
True/False
Question The event numbers as far as possible reflect the logical
relationships of the activities.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question Technique of Value Engineering can be effectively employed
in design of a product to
Correct Answer To meet the intended function at lowest cost
Your Answer To meet the intended function at lowest cost
True/False
Question Proper care and storage is not an essential part of a well
planned lubrication system.
Correct Answer False
Your Answer False
Multiple Choice Single Answer
Question A good plant layout helps in
Correct Answer Reducing handling costs
Your Answer Reducing handling costs
Multiple Choice Multiple Answer
Question Scale model used for layout analysis have following
advantages
Correct Answer Nontechnical person finds it easy to comprehend ,
Ovehead facilities can be shown , Models can be shifted easily
Your Answer Nontechnical person finds it easy to comprehend , Ovehead
facilities can be shown , Models can be shifted easily
Multiple Choice Single Answer
Question The ratio of output to input of a production system is
commonly known as
Correct Answer Productivity
Your Answer Productivity
Multiple Choice Multiple Answer
Question Which of the following products should be produced by using
mass production?
Correct Answer Refrigerator , Tyre for automobile , Television Set
Your Answer Refrigerator , Tyre for automobile , Television Set
True/False
Question Theoretical capacity equals number of normal working hours
of that machine.
Correct Answer True
Your Answer True
True/False
Question It is not necessary to know spare time available on the
non-critical path to allow a little delay for noncritical activity.
Correct Answer False
Your Answer False
Select The Blank
Question Production Planning is a centralised activity which includes
functions such as ________
Correct Answer Scheduling
Your Answer Scheduling
True/False
Question In case of X bar-R charts,it is ensured that the assignable
causes are detected before the tolerances are violated, upper and lower
statistical limits are worked out and inserted into a chart.
Correct Answer True
Your Answer True
Select The Blank
Question The ________ is the process of assigning calender dates to
the various operations of a job.
Correct Answer Scheduling
Your Answer Scheduling
Select The Blank
Question An Ideal OC curve is ________ shaped curve that accpets all
the lots with quality equal to or better than AQL .
Correct Answer Rectangular
Your Answer Rectangular
Multiple Choice Single Answer
Question Any premise in which persons are employed for purpose of
making any product/s is called
Correct Answer Factory
Your Answer Factory
Multiple Choice Multiple Answer
Question Which of the following cases indicates change in physical
characteristic?
Correct Answer Turning , Grinding , Drilling
Your Answer Turning , Grinding , Drilling
Match The Following
Question Correct Answer Your Answer
Combined Layout Mixed Layout Mixed Layout
Fixed Position Layout Project Layout Project Layout
Product Layout Line Layout Line Layout
Process Layout Functional Layout Functional Layout
Select The Blank
Question Two welknown timing methods are cumulative method and
________.
Correct Answer Fly back method
Your Answer Continuous method
Multiple Choice Single Answer
Question How many types of charts are used for the purpose of method
study?
Correct Answer Four
Your Answer Eight
True/False
Question Sampling inspection suffice to check the work of line
inspectors and stage inspectors.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question Where the ignorance towards the degradation of machine leads
to?
Correct Answer Eventual breakdown
Your Answer Eventual breakdown
Multiple Choice Single Answer
Question One of the sophisticated operations research techniques used
in material planning is
Correct Answer Dynamic programming
Your Answer Dynamic programming
Multiple Choice Single Answer
Question Which of the following policies is advisable in case of low
product variety and large volumes?
Correct Answer Low Skilled Labour & Special Purpose Machines
Your Answer Low Skilled Labour & Special Purpose Machines
True/False
Question It pays in the long run to inform the customer regarding
expected delays in the deliveries.
Correct Answer True
Your Answer True
Select The Blank
Question The ________ is a set of tools and techniques by which
products are made to comply with the specifications at minimum cost to the
firm.
Correct Answer Quality control system
Your Answer Quality control system
Select The Blank
Question A ________ is another typical chart which is used to record
frequency of movements between work centers.
Correct Answer Travel chart
Your Answer Frequency chart
True/False
Question Cent percent inspection does not mean inspection of
component for 100% quality characteristics.
Correct Answer True
Your Answer False
Multiple Choice Multiple Answer
Question Route Sheet generally contains following information
Correct Answer Material Specification , Sequence of operation ,
Skill of Labour
Your Answer Material Specification , Sequence of operation , Skill of
Labour
Select The Blank
Question Any incentive scheme must achieve the ________ of the
organisation.
Correct Answer Objectives
Your Answer Tax goals
Multiple Choice Single Answer
Question Document raised by Sales department for goods manufactured
to stock is called
Correct Answer Shipment order
Your Answer Stock order
Multiple Choice Single Answer
Question What do you understand by the timeframe for the maintenance
needs of the equipment?
Correct Answer Maintenance inspection schedule
Your Answer Maintenance inspection schedule
True/False
Question Three time estimates are transformed into expected time
before using it into a network.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question What do you mean by planned corrective manitenance which
provides an opportunity to undertake design modifications in the equipment
to eliminate or reduce frequency of breakdowns.
Correct Answer Design-out Maintenance
Your Answer Design-in Maintenance