Multiple Choice Multiple Answer
Question: Which of the following aspects are essential to ensure quality of purchased items?
Answer: Defining right quality for the job , Vendor performance evaluation , Making sure that suppliers understand the requirements
Select The Blank
Question: The ________ breakdowns usually cost more, partly due to damage done to the adjustment components and partly due to emergency actions.
Answer: Unexpected
True/False
Question: After goods have been manufactured, route sheets and operation layouts should not be collected back.
Answer: False
True/False
Question: In case of centralized inspection, inspection rooms generally become bottleneck and cause delay in taking action regarding rejection or rework.
Answer: True
Multiple Choice Single Answer
Question: MRP is based on the concept of inventory demand which is of following type
Answer: Dependent and independent
Question: Which of the following aspects are essential to ensure quality of purchased items?
Answer: Defining right quality for the job , Vendor performance evaluation , Making sure that suppliers understand the requirements
Select The Blank
Question: The ________ breakdowns usually cost more, partly due to damage done to the adjustment components and partly due to emergency actions.
Answer: Unexpected
True/False
Question: After goods have been manufactured, route sheets and operation layouts should not be collected back.
Answer: False
True/False
Question: In case of centralized inspection, inspection rooms generally become bottleneck and cause delay in taking action regarding rejection or rework.
Answer: True
Multiple Choice Single Answer
Question: MRP is based on the concept of inventory demand which is of following type
Answer: Dependent and independent
Multiple Choice Single Answer
Question: Any premise in which persons are employed for purpose of making any product/s is called
Answer: Factory
Multiple Choice Multiple Answer
Question: Components of Production Management include
Answer: Capacity Planning, Job Design, Production Planning
Multiple Choice Single Answer
Question: Which of the following is the criteria for the percentage defectives in the zone of the indecision?
Answer: Lots having the percentage defective more than AQL but less than LPTD
Question: Any premise in which persons are employed for purpose of making any product/s is called
Answer: Factory
Multiple Choice Multiple Answer
Question: Components of Production Management include
Answer: Capacity Planning, Job Design, Production Planning
Multiple Choice Single Answer
Question: Which of the following is the criteria for the percentage defectives in the zone of the indecision?
Answer: Lots having the percentage defective more than AQL but less than LPTD
Multiple Choice Multiple Answer
Question: Which of the following are examples of addition during recording for method study?
Answer: Brazing, Welding, Riveting
Question: Which of the following are examples of addition during recording for method study?
Answer: Brazing, Welding, Riveting
Select the Blank
Question: The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________.
Answer: Overtime working
Select The Blank
Question: An Ideal OC curve is ________ shaped curve that accpets all the lots with quality equal to or better than AQL .
Answer: Rectangular
Multiple Choice Multiple Answer
Question: Which of the following causes can be responsible for derailing the production schedule in a factory?
Answer: Errors in drawings, Delay in receipt of material from vendor, Excessive absenteeism
Multiple Choice Multiple Answer
Question: Which of the following situations demand the economic consideration while selecting a job for method study?
Answer: Unorderly movement of men and materials, Excessive process defectives, Too many suggestions received for improvement from a department or section
True/False
Question: During set up of X bar-R control chart, control limits should be practically revised from time to time as additional data is accumulated.
Answer: True
Multiple Choice Multiple Answer
Question: Which of the following are the basic requirements of quality standard?
Answer: Definite, Understandable, Economically viable
Question: The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________.
Answer: Overtime working
Select The Blank
Question: An Ideal OC curve is ________ shaped curve that accpets all the lots with quality equal to or better than AQL .
Answer: Rectangular
Multiple Choice Multiple Answer
Question: Which of the following causes can be responsible for derailing the production schedule in a factory?
Answer: Errors in drawings, Delay in receipt of material from vendor, Excessive absenteeism
Multiple Choice Multiple Answer
Question: Which of the following situations demand the economic consideration while selecting a job for method study?
Answer: Unorderly movement of men and materials, Excessive process defectives, Too many suggestions received for improvement from a department or section
True/False
Question: During set up of X bar-R control chart, control limits should be practically revised from time to time as additional data is accumulated.
Answer: True
Multiple Choice Multiple Answer
Question: Which of the following are the basic requirements of quality standard?
Answer: Definite, Understandable, Economically viable
Match the Following
Question Correct Answer
Toung Sweet
Eye Crack
Nose Burnout
Ear Impact
Select the Blank
Question: The ________ is the defect level for which lots are regarded as bad lots.
Answer: Lot Tolerance Percentage Defective
True/False
Question: Floor inspection delays the identification of faults which can not be rectified immediately before large lots are spoiled.
Answer: False
True/False
Question: Cent percent inspection is required on WIP prior to the key, critical or costly operation.
Answer: True
Multiple Choice Single Answer
Question: The document which incorporates details of process planning for a job is called
Answer: Route Sheet
True/False
Question: Repetitive movements between work stations which are difficult to be traced on string diagrams can be conveniently shown on flow diagrams.
Answer: False
Question Correct Answer
Toung Sweet
Eye Crack
Nose Burnout
Ear Impact
Select the Blank
Question: The ________ is the defect level for which lots are regarded as bad lots.
Answer: Lot Tolerance Percentage Defective
True/False
Question: Floor inspection delays the identification of faults which can not be rectified immediately before large lots are spoiled.
Answer: False
True/False
Question: Cent percent inspection is required on WIP prior to the key, critical or costly operation.
Answer: True
Multiple Choice Single Answer
Question: The document which incorporates details of process planning for a job is called
Answer: Route Sheet
True/False
Question: Repetitive movements between work stations which are difficult to be traced on string diagrams can be conveniently shown on flow diagrams.
Answer: False
Choice Single Answer
Question: Which of the following is the most popular technique for Project Production?
Answer: PERT & CPM
Multiple Choice Single Answer
Question: Technique of Value Engineering can be effectively employed in design of a product to
Answer: To meet the intended function at lowest cost
Multiple Choice Single Answer
Question: What can be the worst effect due to excessive vibration?
Answer: Breakdown
Question: Which of the following is the most popular technique for Project Production?
Answer: PERT & CPM
Multiple Choice Single Answer
Question: Technique of Value Engineering can be effectively employed in design of a product to
Answer: To meet the intended function at lowest cost
Multiple Choice Single Answer
Question: What can be the worst effect due to excessive vibration?
Answer: Breakdown
Multiple Choice Single Answer
Question: What is the relation between duration of an activity and length of an arrow?
Answer: No relation
Multiple Choice Single Answer
Question: What is the nature of the sampling plan for critical defects?
Answer: Tight
Select the Blank
Question: The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking.
Answer: Condition monitoring
Multiple Choice Multiple Answer
Question: Which of the following are important considerations concerning activity times?
Answer: Activity time should be obtained from the person responsible for the completion of an activity, Activity time must be independent of any influence which the preceding or succeeding activity may have on it. , Activity time may assume that just the normal quantity of resources required to carry out the activity are available.
Multiple Choice Single Answer
Question: Which of the following techniques is used by industrial engineering department to obtain the utilization index?
Answer: Work Sampling Studies
Multiple Choice Multiple Answer
Question: Which of the following factors play important role while selecting or rejecting a particular site from legislation and taxation point of view?
Answer: Labour laws, Building codes, Policies regarding issue of licenses
Multiple Choice Multiple Answer
Question: Which of the following cases can be referred as operation in method study recording?
Answer: Change in physical characteristic, Consumption of physical effort, Change in chemical characteristic
True/False
Question: An activity can share the same tail event and same head event with any other activity.
Answer: False
Select the BlankQuestion: What is the relation between duration of an activity and length of an arrow?
Answer: No relation
Multiple Choice Single Answer
Question: What is the nature of the sampling plan for critical defects?
Answer: Tight
Select the Blank
Question: The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking.
Answer: Condition monitoring
Multiple Choice Multiple Answer
Question: Which of the following are important considerations concerning activity times?
Answer: Activity time should be obtained from the person responsible for the completion of an activity, Activity time must be independent of any influence which the preceding or succeeding activity may have on it. , Activity time may assume that just the normal quantity of resources required to carry out the activity are available.
Multiple Choice Single Answer
Question: Which of the following techniques is used by industrial engineering department to obtain the utilization index?
Answer: Work Sampling Studies
Multiple Choice Multiple Answer
Question: Which of the following factors play important role while selecting or rejecting a particular site from legislation and taxation point of view?
Answer: Labour laws, Building codes, Policies regarding issue of licenses
Multiple Choice Multiple Answer
Question: Which of the following cases can be referred as operation in method study recording?
Answer: Change in physical characteristic, Consumption of physical effort, Change in chemical characteristic
True/False
Question: An activity can share the same tail event and same head event with any other activity.
Answer: False
Question: The ________ must ensure that the products satisfy the functional requirements of its usage.
Answer: Quality of design
Multiple Choice Multiple Answer
Question: Which of the following are examples of pure materials?
Answer: Bakeries, Ice factories, Woolen
Select the Blank
Question: The ________ are the definitions of the measurable as well as non measurable characteristics of the product.
Answer: Specifications
Multiple Choice Single Answer
Question: Site factors for plant location include
Answer: Suitability of land
Select the Blank
Question: The ________ is the probability that a good lot will be rejected by the sampling plan.
Answer: Producer's risk
Note: Please tally the answers and verify them from SCDL text books as all answers might not be correct.