This solved paper of SCDL Production and Operations Management of SCDL Pune has been contributed by XYZ
Thanks To: XYZ
Multiple Choice Multiple Answer
|
|
Question
|
Which of the following defects can be observed
during preventive inspection by using human senses?
|
Answer
|
Deviation from normal sound , Excessive
Vibration , Leakage of a gas
|
Select The Blank
|
|
Question
|
The ________ includes preventive maintenance
activities whose needs are identified through inspection which requires
stoppage of machines.
|
Answer
|
Shutdown Maintenance
|
True/False
|
|
Question
|
Independent float either affects the float of
preceding activities or that of succeeding activities.
|
Answer
|
FALSE
|
Multiple Choice Multiple Answer
|
|
Question
|
Lack of material planning results in the
following
|
Answer
|
Over ordering
|
True/False
|
|
Question
|
F W Taylor devised a system for classifying
motions into basic divisions called Therbligs
|
Answer
|
FALSE
|
Select The Blank
|
|
Question
|
Work study is also called ________ study
|
Answer
|
Time and Motion
|
Multiple Choice Single Answer
|
|
Question
|
Following is one of the techniques used for
Material Planning for high value material
|
Answer
|
MRP
|
Multiple Choice Single Answer
|
|
Question
|
What do you understand by totality of features
and characteristics of a product or service that bears on it's ability to
satisfy the customer?
|
Answer
|
Quality
|
Select The Blank
|
|
Question
|
One detachable ticket is prepared for each
________.
|
Answer
|
Operation
|
Note: Please tally the answers and verify them from SCDL text books as all answers might not be correct.