True/False
|
|
Question
|
Short cycle job should be studied for
macroscopic motions.
|
Answer
|
FALSE
|
Select The Blank
|
|
Question
|
The ________ is a set of tools and
techniques by which products are made to comply with the specifications at
minimum cost to the firm.
|
Answer
|
Quality control system
|
True/False
|
|
Question
|
Inspection Order can be a verbal order
|
Answer
|
TRUE
|
Multiple Choice Single Answer
|
|
Question
|
Need for change in layout can occur due to
following reason
|
Answer
|
introduction of new product
|
Select The Blank
|
|
Question
|
Goods after final inspection should
accompany ________to enable dispatch department to identify and draw reference.
|
Answer
|
Forwarding note
|
Multiple Choice Multiple Answer
|
|
Question
|
Which are the different methods of recording
actual progress of work?
|
Answer
|
Display boards , Progress cards , Network
updating
|
Select The Blank
|
|
Question
|
The term ________ emplies the foregone
profit due to inability of company to produce.
|
Answer
|
Opportunity cost
|
Multiple Choice Single Answer
|
|
Question
|
What do you mean by lowest possible direct
cost required to complete an activity within it's crashed time?
|
Answer
|
Crash cost
|
Multiple Choice Single Answer
|
|
Question
|
Any premise in which persons are employed
for purpose of making any product/s is called
|
Answer
|
Factory
|
Multiple Choice Single Answer
|
|
Question
|
The process of changing inputs into outputs
thereby adding some value to entity can be defined as
|
Answer
|
Operation
|
Multiple Choice Single Answer
|
|
Question
|
What do you mean by the selection of the job
for the method study on the basis of manufacturing difficulties?
|
Answer
|
Technical consideration
|
True/False
|
|
Question
|
In case of backward pass computation, the
latest event time of the end event equals to the earliest event time minus
duration of that activity.
|
Answer
|
FALSE
|
Match The Following
|
|
Question
|
Answer
|
Emerson Efficiency
Plan
|
Wage Payment
|
Craft
|
Facilities Planning
|
Work Sampling
|
Machine utilization
|
Gantt Chart
|
Production Scheduling
|
Multiple Choice Multiple Answer
|
|
Question
|
Which of the following are examples of
addition during recording for method study?
|
Answer
|
Brazing , Welding , Riveting
|