Question
Expediting action is necessary if the delays and interruptions are abnormal and hence any subsequent delay is bound to extend the promised delivery date.
 Answer
TRUE
Multiple Choice Single Answer
Question
Process Engineer does not get sufficient time for designing tooling for most economic production run when
 Answer
Delivery time is less
Select The Blank
Question
The ________ includes preventive maintenance activities whose needs are identified through inspection which requires stoppage of machines.
 Answer
Shutdown Maintenance
True/False
Question
Breakdown of machines, absenteeism of worker does not dislocate the manufacturing activity in process layout
 Answer
TRUE
Select The Blank
Question
The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average.
 Answer
Acceptable quality level
Multiple Choice Single Answer
Question
 What do you mean by lowest possible direct cost required to complete an activity within it's crashed time?
 Answer
Crash cost
Multiple Choice Multiple Answer
Question
Which are the first three steps of Critical Path Analysis technique?
 Answer
Activity relationships , Activity identification , Network construction
True/False
Question
 Dust gets mixed with lubricants, forms an abrasive substance and causes pre-mature failure of machinery.
 Answer
 True
Multiple Choice Multiple Answer
Question
Which of the following can be subtypes of ive maintenance?
 Answer
Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance
Select The Blank
Question
The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking.
 Answer
Condition monitoring
Multiple Choice Single Answer
Question
The process of changing inputs into outputs thereby adding some value to entity can be defined as
 Answer
Operation
Match The Following
Question  
Answer


Toung
Sweet


Eye
Crack


Nose
Burnout


Ear
Impact
Select The Blank
Question
The ________ is a set of tools and techniques by which products are made to comply with the specifications at minimum cost to the firm.
 Answer
Quality control system
Multiple Choice Single Answer
Question
What is the meaning of " Product features" according to J.M.Juran?
 Answer
 Quality of design
Multiple Choice Multiple Answer
Question
Which of the following method can be used to record the facts during the method study?
 Answer
Micromotion study , Cyclegraph , Chronocyclegraph
True/False
Question
 All activities must not be tied up into the network
 Answer
 False
Multiple Choice Multiple Answer
Question
Which of the following are types of sampling plan?
 Answer
Single sampling plan , Double sampling plan , Multiple sampling plan
 
 
 Note: Please tally the answers and verify them from SCDL text books as all answers might not be correct.

No comments:

Search Assignments and Papers Here...


Custom Search

An Appeal to SCDL students

Dear SCDL Student,

We at http://scdlpapers.blogspot.com tries to collect and spread the knowledge in terms of the solved papers and assignments which we are getting through SCDL Alumni.
Now we request you to help other students through mutual sharing. Please send your assignment questions/papers to "mindgrill@gmail.com" . We will publish them on this blog along with your name.
Your help can be boon for many students to clear their exams.

Best of Luck and waiting for your contributions.

Team @ MindGrill