Multiple Choice Single Answer
|
|
Question
|
MRP is based on the concept of
inventory demand which is of following type
|
Answer
|
Dependent and independent
|
Multiple Choice Single Answer
|
|
Question
|
Main objective of a good plant
layout is
|
Answer
|
Reduce material handling cost
|
True/False
|
|
Question
|
As a general rule, the number of
tail event of an activity is more than that of it's head event.
|
Answer
|
FALSE
|
Select The Blank
|
|
Question
|
The ________ is the probability
that a good lot will be rejected by the sampling plan.
|
Answer
|
Producer's risk
|
Multiple Choice Multiple Answer
|
|
Question
|
Which of the following are
important considerations concerning activity times?
|
Answer
|
Activity time should be obtained
from the person responsible for the completion of an activity , Activity time
must be independent of any influence which the preceding or succeeding
activity may have on it. , Activity time may assume that just the normal quantity
of resources required to carry out the activity are available.
|
Select The Blank
|
|
Question
|
The ________ pertain to the
climatic conditions which the component , product or material should
withstand.
|
Answer
|
Environmental specifications
|
Multiple Choice Multiple Answer
|
|
Question
|
Following are some of the factors
considered for evaluation of alternative layouts
|
Answer
|
Flow of Material , Equipment
utilization , Ease of supervision
|
Multiple Choice Multiple Answer
|
|
Question
|
Which of the following are
assignable cause?
|
Answer
|
Large varaitions in hardness of
material , Tool wear , Errors in setting
|
True/False
|
|
Question
|
All activities must not be tied
up into the network
|
Answer
|
FALSE
|
Select The Blank
|
|
Question
|
In case of an OC curve, the risk
of rejecting a good quality lot may vary between ________.
|
Answer
|
0.01 to 10%
|
True/False
|
|
Question
|
In case of X bar, if the process
is not under control indicated by some points falling outside the control
limits, such points outside the control limits are eliminated and new trial
control limits for the remaining points are computed.
|
Answer
|
TRUE
|
Multiple Choice Single Answer
|
|
Question
|
What is the base for considering
activity time as single time estimate or three time estimate?
|
Answer
|
Level of uncertainty
|
Select The Blank
|
|
Question
|
The ________ is the maximum
percentage defective that for the purpose of sampling inspection can be
considered satisfactory as a process average.
|
Answer
|
Acceptable quality level
|
Multiple Choice Single Answer
|
|
Question
|
What do you mean by lowest
possible direct cost required to complete an activity within it's normal
time?
|
Answer
|
Normal cost
|
Select The Blank
|
|
Question
|
A good maintenance system is not
a luxary but a ________.
|
Answer
|
Necessity
|
Select The Blank
|
|
Question
|
A ________helps to avoid crowding
of jobs at a particular machine by change of route of some of the jobs or by
diverting work to other machine.
|
Answer
|
Control board
|
Select The Blank
|
|
Question
|
The ________ is the watch dog
which ensures that every element of production and activities which could
affect the quality of end product are regulated to the extent desirable.
|
Answer
|
Quality control
|
Multiple Choice Single Answer
|
|
Question
|
Any premise in which persons are
employed for purpose of making any product/s is called
|
Answer
|
Factory
|
Note: Please tally the answers and verify them from SCDL text books as all answers might not be correct.