True/False
|
|
Question
|
All
activities must not be tied up into the network
|
Answer
|
FALSE
|
Select The Blank
|
|
Question
|
In
case of an OC curve, the risk of rejecting a good quality lot may vary
between ________.
|
Answer
|
0.01
to 10%
|
True/False
|
|
Question
|
In
case of X bar, if the process is not under control indicated by some points
falling outside the control limits, such points outside the control limits
are eliminated and new trial control limits for the remaining points are computed.
|
Answer
|
TRUE
|
Multiple Choice Single Answer
|
|
Question
|
What
is the base for considering activity time as single time estimate or three
time estimate?
|
Answer
|
Level
of uncertainty
|
Select The Blank
|
|
Question
|
The
________ is the maximum percentage defective that for the purpose of sampling
inspection can be considered satisfactory as a process average.
|
Answer
|
Acceptable
quality level
|
Multiple Choice Single Answer
|
|
Question
|
What
do you mean by lowest possible direct cost required to complete an activity
within it's normal time?
|
Answer
|
Normal
cost
|
Select The Blank
|
|
Question
|
A
good maintenance system is not a luxary but a ________.
|
Answer
|
Necessity
|
Select The Blank
|
|
Question
|
A
________helps to avoid crowding of jobs at a particular machine by change of
route of some of the jobs or by diverting work to other machine.
|
Answer
|
Control
board
|
Select The Blank
|
|
Question
|
The
________ is the watch dog which ensures that every element of production and
activities which could affect the quality of end product are regulated to the
extent desirable.
|
Answer
|
Quality
control
|
Multiple Choice Single Answer
|
|
Question
|
Any
premise in which persons are employed for purpose of making any product/s is
called
|
Answer
|
Factory
|
Match The Following
|
|
Question
|
Answer
|
Emerson
Efficiency Plan
|
Wage
Payment
|
Craft
|
Facilities
Planning
|
Work
Sampling
|
Machine
utilization
|
Gantt
Chart
|
Production
Scheduling
|
Select
The Blank
|
|
Question
|
A
________ is another form of subcontracting.
|
Answer
|
Hiring
capacity
|
Multiple Choice Multiple Answer
|
|
Question
|
In an
organization there may not be a formal PPC department if
|
Answer
|
Work
is highly repetitive in nature , Planning activities are performed by the
line staff , Number of workmen is not very large
|
Multiple Choice Multiple Answer
|
|
Question
|
Which
of the following cases can be treated as delay during recording of method
study?
|
Answer
|
Operators
awaiting instructions from supervisor , Worker waiting for his turn at tools
stores , Jobs awaiting at the machines for their turn
|
True/False
|
|
Question
|
Inspection
order is must even for simple jobs which can be inspected by shop inspector
with the tooling available on shop.
|
Answer
|
FALSE
|
Multiple Choice Multiple Answer
|
|
Question
|
Order
preparation process for products manufatured to order requires following
documents
|
Answer
|
Sales
Order , Work order , Shop order
|
Multiple Choice Single Answer
|
|
Question
|
Technique
of Value Engineering can be effectively employed in design of a product to
|
Answer
|
To
meet the intended function at lowest cost
|
True/False
|
|
Question
|
Cent
percent inspection is often more practical and economical than sampling
inspection.
|
Answer
|
FALSE
|
Multiple Choice Multiple Answer
|
|
Question
|
Scale
model used for layout analysis have following advantages
|
Answer
|
Nontechnical
person finds it easy to comprehend , Ovehead facilities can be shown , Models
can be shifted easily
|
Note: Please tally the answers and verify them from SCDL text books as all answers might not be correct.
No comments:
Post a Comment