SCDL Production and Operations Management Paper - 45

This solved paper of SCDL Production and Operations Management of SCDL Pune has been contributed by XYZ

 Thanks To: XYZ
 
 
True/False
Question
The problems of congestion, bottlenecks and backtracking can not be visualized by using templates and models.
 Answer
FALSE
Multiple Choice Multiple Answer
Question
Following are some of the factors which influence process planning
 Answer
Order Quantity , Process capability of machine , Delivery Dates
Multiple Choice Single Answer
Question
Gross requirement of products is determined on the basis of
 Answer
Both forecast and pending orders
True/False
Question
Skill of labour force in a product type layout is usually higher than in the process type of layout
 Answer
FALSE
Multiple Choice Single Answer
Question
In exponential smoothing method,for a stable demand pattern and better smoothing effect, value of fraction( Alpha) selected is
 Answer
0.05 to 0.10
True/False
Question
Recording of movement is not necessary in case of method study in any form.
 Answer
FALSE
Multiple Choice Multiple Answer
Question
Which of the following may be the objectives of project crashing?
 Answer
To complete the project in the least possible time , To reduce project cost below it's normal cost , To achieve uniformity in requirement of resources
Multiple Choice Single Answer
Question
Which is the next stage to the inspection based quality control in the historical development of quality management.
 Answer
Quality assurance
Select The Blank
Question
The ________ includes preventive maintenance activities whose needs are identified through inspection which requires stoppage of machines.
 Answer
Shutdown Maintenance
Multiple Choice Single Answer
Question
Inadequate production capacity ultimately leads to
 Answer
Poor Customer Service
Select The Blank
Question
The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking.
 Answer
Condition monitoring
True/False
Question
Inspection should be conducted on all incoming materials, semifinished items, bought out components, subcontract items prior to any operation, assembly.
 Answer
TRUE
Select The Blank
Question
The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average.
 Answer
Acceptable quality level
 
Note: Please tally the answers and verify them from SCDL text books as all answers might not be correct.

0 Comments:

An Appeal to SCDL students

Dear SCDL Student,

We at http://scdlpapers.blogspot.com tries to collect and spread the knowledge in terms of the solved papers and assignments which we are getting through SCDL Alumni.
Now we request you to help other students through mutual sharing. Please send your assignment questions/papers to "mindgrill@gmail.com" . We will publish them on this blog along with your name.
Your help can be boon for many students to clear their exams.

Best of Luck and waiting for your contributions.

Team @ MindGrill
 

Interview Preparation | Placement Papers